Bernard Venet Sculpture
Back to all For this disassembly, we used a 10 ton gantry, a 5K forklift, and a 3 ton chain hoist (attached to the structure of the building in order to keep the top portion upright). We suspended the work with all the equipment simultaneously before using a torch to cut/separate the work in order […]
African Marble Statue
Back to all Rigging, crating, and relocation of the work to a private residence in East Texas. Due to the location of the work within the living room of the house, we had to cantilever our gantry crane in order to position the hoist directly above the work. Prior to any of this happening, it’s […]
John Brough Miller “Wind Sweep” 1990-1999
Back to all Rigging, transportation, and installation of the work on a berm in a traffic circle on the corporation’s campus. We used a 12K (capacity) articulating reach forklift to rig and maneuver the work from our flatbed trailer to the installation site. Once we were at the site, we had to re-rig the work […]
Bartolome Esteban Murillo “The Immaculate Conception” 1655-60
Back to all Installation on the landing in the main entry of the museum. The installation required 8 fine art handlers using a manually operated hydraulic lift. In order for the work to be presented at its best for both floors, we installed it at a slight angle. We used lumber to reinforce the wall […]